- Product Categories
- Friendly Links
Information Name: | Anping Xin Bo Mesh Products Co., Ltd. - Wind Dust Network design and construction |
Published: | 2015-07-22 |
Validity: | 0 |
Specifications: | According to customer requirements |
Quantity: | 999999999.00 |
Price Description: | |
Detailed Product Description: | Wind Dust Network is bulk storage yard for outdoor dust pollution the most advanced technology, it is widely used in the coal yard and stockyard dust pollution port terminals, thermal power, coal, coke, iron and steel, coal, cement and other enterprises . The product leverages aerodynamics, the source of the dust - the wind for effective control, the maximum kinetic energy of the wind flow attenuation, reducing its dust dusting and carrying capacity, so as to achieve the effect of dust suppression, integrated wind and dust rate up to 80%, it has been used as the main dust pollution control technology to be applied. 1, power plants, coal mines, coking plants, coal preparation plant and other enterprises coal yard 2, ports, terminals and all kinds of coal yard yard 3, iron and steel, building materials, cement and other enterprises of various open-air yard 4, railways, roads coal loading station coal yard plot 5, construction sites, road works temporary construction field 6, field production and living spaces harsh wind environment have an impact on people's life and production. By installing Wind Dust Network in place, can reduce the wind speed within a certain range, improve the wind environment, improve environmental quality, people's production and life to create a more favorable micro-climate. Design and construction of underground base is divided into four parts (1) air filter: pouring underground base prefabricated concrete blocks or field. (2) windbreak supporting structure: engineering design wind speed by wind design parameters. With steel supporting bracket, stents for "wind and dust wall" provide sufficient strength to withstand strong winds damage, followed by consideration of the overall appearance. Stent body chosen steel, reinforced concrete pillars as "wind and dust wall" bracket. (3) The windshield installation: service life of 15 to 20 years. Ambient temperature: -40 ℃ to + 80 ℃, connected by screws and plate fixation. Pull the wind and dust of specific dimensions, bending, opening rate should be designed according to the actual situation yard. (4) retaining brick wall: In order to prevent the spillover of slime water after rain and snow, the lower part of the windshield can be set to 1.2 to 1.5 meters wall retaining brick wall. |
Admin>>>
You are the 6221 visitor
Copyright © GuangDong ICP No. 10089450, Anping Xin Bo Mesh Products Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 6221 visitor
Copyright © GuangDong ICP No. 10089450, Anping Xin Bo Mesh Products Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility